Talati & Co. Electrification

We Build The Supply
And We Get It Sanctioned.

An electrical contractor working on HT and LT distribution across South Gujarat — overhead lines, underground cabling, transformers, substations, panels and earthing. And the half of the job that happens in offices: connections, load extensions and the statutory approvals that decide when a site can actually be energised.

Most contractors do one half and hand you the other. Carrying both is the whole point of how this firm is set up.

Trading since
[year to confirm]
Base
Tighra, Navsari, Gujarat
Working area
South Gujarat
Crew strength
[headcount to confirm]
Contractor licence
[class & number to confirm]
DISCOM
[empanelment status to confirm]

Everything from the utility tapping point to the machine terminal — and the paperwork that lets you switch it on.

ON SITE Overhead HT / LT line Underground cabling Transformer & substation Panels & switchgear Earthing & testing IN THE OFFICE HT / LT connection Load extension Feasibility & estimate Inspector approval Metering & charging ONE CONTRACT ONE CREW A SITE THAT CAN BE ENERGISED NOTHING SITS IN THE GAP BETWEEN TWO VENDORS, AND NOBODY WAITS ON THE OTHER ONE’S CONTRACTOR
Who Turns Up

The Trades We Field

Roles rather than a photo wall. What matters on an electrical job is which trades are on the crew and who is licensed to sign for the work.

  1. 01 Site supervision Runs the sequence on site, holds the permit discipline, and is the single person answerable for whether the job is ready for the date it was promised.
  2. 02 Licensed electrical contractor Signs the completion and test reports that the DISCOM and the Electrical Inspector accept. Without this licence in the file, no installation gets energised.
  3. 03 Line crew Pole erection, stringing and sagging, work at height and work adjacent to live conductors. Trained for the height and the proximity, not just the task.
  4. 04 Cable jointers Straight-through joints and terminations up to 33 kV. Specialists who do only this, because a joint made by an occasional jointer is where the circuit fails.
  5. 05 Testing & commissioning Earth resistance, insulation resistance, transformer tests, protection settings. Measured with instruments and written down, because that record is what the Inspector reads.
  6. 06 Liaisoning Carries the file through the DISCOM and the Inspector’s office — applications, feasibility, estimates, agreements and approvals — while the site work runs.
How We Work

Four Things We
Do Not Compromise

01

One contractor for the whole scope

Survey, material, erection, jointing, testing, handover and the approvals behind them all sit with one team. There is no gap between two vendors for work to fall into, and no week lost waiting on somebody else’s contractor.

02

Earthing before anything else

Every protective device on a site depends on a return path that actually works. Earthing gets dug, bonded and measured — a reading on a sheet, not a pit count on a drawing.

03

Records made as the work happens

Test results are written down when the test is done, not reconstructed the week before an inspection. It is the difference between one visit from the Electrical Inspector and three.

04

The load you will have, not the load you have

Sizing against today’s connected load is how a plant ends up applying for a load extension two years later. We ask what is coming before we size the transformer and the cable.

Speak To

Jignesh Talati

[role to confirm]

+91 90337 14421

Tighra, Navsari, Gujarat

Have a site, a load and a date?

Send those three things. We survey, then come back with a defined scope, the approvals it needs and what it costs — not a number pulled out of the air.