The Work
LT underground is the bulk of the cabling on any working plant: transformer to LT panel, panel to MCC, MCC to machine, and the sub-mains that feed sheds, pumps, compressors and lighting. There is a lot of it, it grows every year, and it is usually the part that gets done fastest and documented least.
We size and route it properly — cable sized against load current, length and voltage drop rather than against whatever is on the shelf — then gland, terminate and ferrule it so that the next person to open the panel can tell what goes where. Tray and trench routes are laid out so future circuits can be added without re-doing the run.