Installation Services / 02b

Underground LT Cable

415 V armoured cable from the transformer LT side to panels, MCCs, machines and site distribution — laid, glanded, terminated and tested.

LT PANEL CABLE TRAY · SPARE CAPACITY FOR LATER MCC / MACHINE DOUBLE-COMPRESSION GLAND CRIMPED LUGS ARMOUR BOND 3% LIMIT VOLTS AT LOAD CABLE LENGTH UNDER-SIZED CABLE CROSSES THE LIMIT BEFORE THE FAR END

Two things decide an LT run: the termination and the length. A gland and lug done properly stays cool under load; a cable sized on current alone runs out of volts before it reaches the far end, and the symptom looks like a machine fault.

The Work

LT underground is the bulk of the cabling on any working plant: transformer to LT panel, panel to MCC, MCC to machine, and the sub-mains that feed sheds, pumps, compressors and lighting. There is a lot of it, it grows every year, and it is usually the part that gets done fastest and documented least.

We size and route it properly — cable sized against load current, length and voltage drop rather than against whatever is on the shelf — then gland, terminate and ferrule it so that the next person to open the panel can tell what goes where. Tray and trench routes are laid out so future circuits can be added without re-doing the run.

Scope Covered

  • Armoured LT XLPE / PVC cable laying in trench, tray or duct
  • Cable tray, ladder and racking fabrication and erection
  • Double-compression glanding, lugging and crimping
  • Termination into LT panels, MCC / PCC, DBs and machines
  • Cable ferruling, schedule and as-laid marking
  • Armour and body earthing, IR and continuity testing
415 V 3-phase distribution
Al / Cu Armoured XLPE
Voltage drop Sized on length, not habit
Why It Matters

Where This Work
Decides The Outcome

Under-sized cable shows up as a machine problem

A long LT run sized only on current, not voltage drop, delivers low volts at the far end. The symptom looks like a motor fault or a drive tripping — the cause is the cable, and it stays hidden until someone measures at the load.

Loose terminations are the usual fire

LT panel fires almost always start at a termination that was not torqued or was lugged onto a dirty face. Correct crimping, double-compression glands and a re-check on load is a small job that prevents the largest one.

Ferruling pays back at 2 a.m.

The value of a labelled cable schedule is not felt on the day of installation. It is felt the night a breakdown crew has to identify one core out of forty in a live panel.

How We Execute

Survey To Handover

01

Sizing & routing

Cable sized on load current, route length and permissible voltage drop; tray and trench routes set out with spare capacity.

02

Laying & dressing

Cable laid, clamped and dressed on trays and in trenches, with bending radius maintained at every change of direction.

03

Termination

Glanded, lugged, crimped and ferruled into panels, MCCs and machines; armour and body earthing bonded.

04

Test & energise

IR, continuity and phase sequence checked, circuit energised and terminations re-checked under load.