Sanctioned load is what you agreed to draw, not what your equipment can draw. Plants grow — a compressor here, a second line there — and the sanction quietly stops matching reality. The DISCOM notices through the maximum demand recorded on your own meter, and the correction arrives as a penal tariff rather than a reminder.
A load extension is the fix, and it is worth doing deliberately rather than reactively. The first question is not how much more you need this year, but whether the number you apply for takes you across the LT ceiling — because if it does, the application stops being a load extension and becomes an HT connection, with drawings, an agreement, a substation and a statutory approval behind it.
We audit what you actually draw against what you are sanctioned for, work out the right number to apply for, file it, follow the feasibility and the revised estimate, and build whatever the sanction turns out to require — a larger transformer, an upgraded cable, or the full HT changeover.