LT is the faster route, and the reason is structural: there is no statutory inspection stage. A file that is complete and consistent moves through scrutiny, an estimate, a test report and a meter. What holds LT applications up is almost never technical — it is a document that does not match another document.
Gujarat raised the LT ceiling from 100 kW to 150 kW in the 2024 amendment to the Electricity Supply Code, which means loads that would previously have been pushed onto an HT file can now stay on the simpler one. Working out honestly which side of that line you sit on, before anything is submitted, is the single most useful hour on the job.
We prepare and file the application, follow it through scrutiny and the demand note, do the internal installation work where it is in scope, issue the completion and test report as a licensed contractor, and stay with it until the meter is installed and the supply is on.