Liaisoning Work
The Part That
Happens In Offices
Erecting a line is the visible half. The other half is a file moving between the DISCOM and the Electrical Inspector, and it is usually the half that decides your energising date. We carry both, so nobody is waiting on the other party’s contractor.
Start Here
Which Situation
Are You In?
01
You have no supply at the premises yet, and the load is above the LT ceiling
HT Connection
A full HT file: feasibility, estimate, agreement, substation, and the Electrical Inspector before it can be charged.
02
You have no supply yet, and the load sits within the LT ceiling
LT Connection
The short route. Application, survey, demand note, test report, meter — no statutory inspection stage to wait on.
03
You have supply, but not enough of it — or you are being billed a penalty
Load Extension
Raise the sanctioned load to match what you actually draw, and build whatever the higher sanction turns out to require.
04
The installation is built, and nobody is allowed to energise it yet
Electrical Installation Approvals
Drawings, measured test results and site inspection through the Electrical Inspector, under the CEA safety regulations.
Not Sure Which
One You Need?
Send your latest bill and the load you are trying to run. That is usually enough to tell you which file you are actually starting, and roughly what it costs.