The Work
An overhead line is the cheapest way to move power across open ground and the fastest to fault-find, which is why most industrial estates, farm feeders and plant extensions in South Gujarat still run overhead. What decides whether it stays up is not the conductor — it is the route survey, the foundation depth, the sag tension and the earthing.
We take the line end to end: walk the route and fix pole positions against ground clearance and crossings, cast foundations, erect PSC or steel poles, fit cross-arms, insulators and stay sets, string and sag the conductor, then earth, test and charge. HT and LT on the same run are handled together, so the crossarm arrangement, clearances and pole loading are worked out once rather than argued over between two contractors.