Tell Us The Load,
The Site And
The Date.

Those three things are enough for us to tell you whether it is an LT job or an HT file, roughly how long the approvals will take, and what we would need to see on site.

Send an enquiry * required

Prefer not to fill this in? Call +91 90337 14421 or write to us.

After You Send It

What Happens Next

  1. 01

    We read it and call you

    Usually with questions before answers — the load, the voltage you have today, whether there is an existing connection at the premises.

  2. 02

    We come and look

    Almost nothing on an electrical job can be quoted honestly from a description. The survey is where the route, the clearances and the real scope get decided.

  3. 03

    You get a scope, not a number

    What we will build, what has to go through the DISCOM or the Inspector, what you supply, and what it costs — written down so it can be compared with anyone else’s.

Supply Down?

Call, Don’t Type.

A breakdown on an HT feeder or a transformer is not a form. Ring the number and say where the site is.